
-
Feasibility Study for widening to 2-lane with paved shoulders KM 40/000-118/000 and 147/000 to 170/000 on NH-54
tæt på Rengte, Assam (India)
-
Feasibility Study and preparation of DPR for Aizawl By-pass for Nh-54
tæt på Seling, Mizoram (India)
-
Widening to 2-lane with geometric improvement of Kumarghat-Ambassa section of NH-44
tæt på Kumarghat, Tripura (India)
-
8. Rehabilitation of Maudarh RCC Bridge for 12.20m span on NH-54 at 373/673 Kmp for the year 2015-2016 in the state of Mizora
tæt på Kolasib, Mizoram (India)
-
Widening to 2-lane with Geometric Improvement of NH-154 from Km 119/00 to Km 147/00 in Mizoram
tæt på Bhairabi, Assam (India)
-
2-Laning of NH-54 from Km 118/00 to Km 133/00 (15Km) in the state of Mizoram under SARDP-NE Phase 'A'
tæt på Kawnpur, Mizoram (India)